AI-powered delay risk prediction in construction projects: leveraging machine learning, deep learning and hybrid models

The record

Type
Publication
Date
1 January 2026
Level
National
Journal
International Journal of Construction Management
Volume
26
Issue
12
Pages
2837-2858
Published
1 January 2026
DOI
10.1080/15623599.2026.2619678
Scopus ID
105029602759
ISSN
15623599
Authors
5
Open access
No
Citations
1
International co-authorship
No
Co-author countries
IN

Classification

Every label below carries the reasoning it was assigned on, the confidence band it was assigned in, and what produced it. The rubric is published.

UN Sustainable Development Goals

  1. 9.2 Promote inclusive and sustainable industrialization and raise industry’s share of employment and GDP

    TargetPrimaryHigh confidenceJudged

    CNN-BiLSTM hybrid neural network for construction delay prediction from 68 projects achieves 95.56% accuracy, enabling proactive project risk management.

    High confidence
    The subject matter is a strong and direct inference from the record type, the funding or organising body, or the programme context, even where the title alone is thin. Example: an ICMR-funded project against SDG 3, on the strength of the agency.
    Judged
    Judged against the published classification rubric, under the rubric and prompt versions recorded with the run that produced it.
    Produced by
    claude-haiku-4-5-20251001, under kortex-publication-v1
  2. 9.5 Enhance scientific research, upgrade technological capabilities, and increase researchers and R&D spending

    TargetSecondaryHigh confidenceJudged

    Deep learning algorithm development combining CNN and LSTM for temporal-spatial pattern recognition advances AI methodology innovation.

    Produced by
    claude-haiku-4-5-20251001, under kortex-publication-v1

Viksit Bharat @2047

  1. vb-2.4 Infrastructure and connectivity

    Sub-themePrimaryHigh confidenceJudged

    Construction project scheduling optimization and risk prediction support infrastructure development and cost management.

    Produced by
    claude-haiku-4-5-20251001, under kortex-publication-v1

Each label above carries the instrument and the version that produced it. How each classification is reached.

Evidence

Kortex hosts no documents. Evidence is an outbound link to the authority that holds it.

No outbound evidence link is recorded for this activity. The record below states which source it came from and when it was last read.

Provenance

Which source system this record came from, how many source rows were resolved into it, and when each was last read.

Source rows resolved into this record
1

Each record carries the date Kortex last read it from its source system. That is a freshness date and not a verification: Kortex records what its sources say and when it read them, and it does not check those statements against any external authority. No claim on this site is described as verified, because none is.

Citing this record

This URL is stable. A record’s permalink is frozen when it is published and is not regenerated if its title is later corrected.

KIIT Deemed to be University. “AI-powered delay risk prediction in construction projects: leveraging machine learning, deep learning and hybrid models”. Kortex.

Explore the full record