dewatering design scheme for Azure project

The record

Type
Consultancy
Date
21 November 2025
School
Reporting cycle
2025
Nature
Consultancy
Sanctioned
21 November 2025
Period
0.50
Funding agency
AGM-Projects, AcreRise
Sanction reference
ARLLP-WO/036-2025
Investigators
1

Classification

Every label below carries the reasoning it was assigned on, the confidence band it was assigned in, and what produced it. The rubric is published.

UN Sustainable Development Goals

  1. 9.1 Develop quality, reliable, sustainable and resilient infrastructure to support economic development and human well-being

    TargetPrimaryModerate confidenceJudgedrubric 1.1.0

    Civil engineering consultancy designing a dewatering scheme for a construction project.

    Moderate confidence
    The alignment is plausible and defensible but rests on an assumption a reasonable reviewer could decline. Published, and surfaced in the review queue for a human to confirm or override.
    Judged
    Judged against the published classification rubric, under the rubric and prompt versions recorded with the run that produced it.
    Produced by
    claude-opus-5[1m], under kortex-input-v1+rubric@1.1.0#7bc5877481c9Input template kortex-input-v1; rubric 1.1.0. Each can change without the others, which is why the version is a composite.
  2. 6.4 Substantially increase water-use efficiency and address water scarcity

    TargetSecondaryModerate confidenceJudgedrubric 1.1.0

    Civil engineering consultancy designing a dewatering scheme for a construction project.

    Produced by
    claude-opus-5[1m], under kortex-input-v1+rubric@1.1.0#7bc5877481c9Input template kortex-input-v1; rubric 1.1.0. Each can change without the others, which is why the version is a composite.

Viksit Bharat @2047

  1. vb-3 Innovation, Science and Technology

    ThemePrimaryModerate confidenceJudgedrubric 1.1.0

    Derived through the seeded SDG-to-Viksit-Bharat crosswalk from the primary SDG 9 label. Civil engineering consultancy designing a dewatering scheme for a construction project.

    Produced by
    claude-opus-5[1m], under kortex-input-v1+rubric@1.1.0#7bc5877481c9Input template kortex-input-v1; rubric 1.1.0. Each can change without the others, which is why the version is a composite.

Records of this type were classified by individual judgment against the published rubric, over 1,101 activities. Each label above carries the rubric version it was produced under. How each classification is reached.

Evidence

Kortex hosts no documents. Evidence is an outbound link to the authority that holds it.

No outbound evidence link is recorded for this activity. The record below states which source it came from and when it was last read.

Provenance

Which source system this record came from, how many source rows were resolved into it, and when each was last read.

Source rows resolved into this record
1
Source records held
1
Source records for this activity, with the date each was last read.
Source systemReferenceLast read
KIIT PBAS reporting workbook (consolidated)Data - Project & Consultancy!80

Each record carries the date Kortex last read it from its source system. That is a freshness date and not a verification: Kortex records what its sources say and when it read them, and it does not check those statements against any external authority. No claim on this site is described as verified, because none is.

Citing this record

This URL is stable. A record’s permalink is frozen when it is published and is not regenerated if its title is later corrected.

KIIT Deemed to be University. “dewatering design scheme for Azure project”. Kortex. Last read 17 September 2026.

Explore the full record